So what can I show you.....
Flat roof insulation (expertly installed by us)
Rubber roof adequately installed by the 'experts'
The lounge wall is up
The wine rack housing is in (there's room for 144 bottles. I can't wait)
The basement blockwork is complete, making our Utility and Store
(A store big enough for a table tennis table or pool table or just junk)
Soil stacks are in and so is the rainwater feed to the WCs
Externally the brickwork is complete, all first floor windows are in
the profile sheet roof is on the timber clad side and the battens are being istalled ready for the cladding which is due to start on Saturday
As you can see things are coming along nicely. Next jobs on site are to fit the gutters to allow the scaffold to be dropped on the brickwork side. This will allow the ground floor windows to be installed making to house secure.
Then we can get the electrician and heating guys in. After that we're begining to look at plasterboarding the walls. Then we must surely be close to the end.